I connect national compute infrastructure not only to industrial capacity but also to national security, the broader Six Networks infrastructure push, and the risk of near-term supply constraints.
I shared the argument that computing power is a matter of national security.
I shared the warning that if computing resources cannot be supplied efficiently, the AI industry, smart manufacturing and even national defense will be constrained.
I shared @JiangJiang43’s question about whether better networks could help China ease hardware constraints on AI development, alongside the concept of a “high-speed rail for computing power.”
I reported that the head of China’s NDRC said China was spending over US$ 1 trillion this year alone on Six Networks and related areas.
- I described the Six Networks water network as “Water - esp. cross-regional systems”.
- I described the Six Networks power grid as “Power grid - esp. smart grid for renewables”.
- I described the Six Networks compute network as “Compute - AI data centers, national network”.
- I described the Six Networks communications network as “Communications - 5G-A, fiber, satellite”.
- I included urban underground pipelines among the Six Networks.
- I described the Six Networks logistics network as “Logistics - smart integrated transport”.
I recommended The Economist’s Drum Tower episode about China’s Six Networks and called it a great episode.
I reported Alibaba’s CEO saying that the new compute export control rules “will affect next year's products and services”.
I reported Alibaba’s CEO saying, “our own progress in developing domestic computing power is in fact already ahead of our original expectations.”
I reported that China will face a compute supply crunch in 2027 and 2028 before domestic production ramps up.
I track China’s infrastructure-led compute buildout, its large-scale clusters, and the links between compute capacity and clean energy. These developments sit alongside Alibaba’s ambitions in chips, models, and global compute. They also connect to data centers meet power limits and chinas clean tech industry.
I describe China’s compute buildout as part of its broader infrastructure buildout.
China is planning invest $3.7 trillion over 5 years on six networks: $3.7 trillion over 5 years.
- I described the six networks as water, grid, compute, communications, city pipelines, and logistics.
I distinguish compute investment by Chinese tech firms from public investment: “Compute investment by Chinese tech firms is a different story.”
I call China’s public compute investment a familiar story: “But for public investment, this is a very familiar story.”
I contrast this with the US, where the compute buildout is an outlier and is pulling along everything else like energy.
I gave a hat tip to @pstAsiatech for the comparison: H/t @pstAsiatech.
I wrote that Alibaba is aiming for 20 GW of global compute by 2032: 20 GW global compute by 2032.
I described new Zhenwu AI chips as 3x more powerful, with mass production starting Q1 next year.
I reported that Qwen 4 is in training: Qwen 4 in training.
I said future Alibaba models are expected to reach 5-10 trillion parameters.
I shared that China completed its first end-to-end domestic AI supercluster with 100,000 chips in Zhengzhou.
I noted that computing projects with fewer than 100,000 chips now struggle to enter this contest.
For offline training of a model with hundreds of billions of parameters, I shared that an overseas-chip cluster with 100,000 chips completes training in about 12 days versus 18 to 21 days for an end-to-end domestic-chip cluster.
I noted that some Chinese compute clusters, especially those with heterogeneous domestic chips, have utilization rates below 20%.
I described low utilization as an ongoing problem: “The low utilization issue is still a problem.”
I reported that China is preparing to launch a national integrated compute network that will allocate workloads across clusters.
I noted that local governments are racing to build enough compute to be connected to this national platform.
A local state-owned platform representative said, “What people are competing for now is an admission ticket,” and argued, “Once the scheduling platform really works, it will be too late to start building.”
I reported that many compute workloads cannot be moved to the west due to latency, and quoted the figure: “More than 60% of computing demand cannot move to the west.”
I reported that data security is another obstacle to cross-national workload allocation and that there are rules against moving data between provinces.
I wrote that China is increasingly tying its compute buildout with its clean energy buildout.
I reported that qualifying data centers can be designated as “National Green Compute Facilities” 国家绿色算力设施.
- I described five qualification criteria: a province-dependent minimum renewable-energy share of electricity; location in a national integrated compute network hub or compute-power coordination pilot zone; energy efficiency above a certain level; >60% rack occupancy; and smooth operation for at least one year.
I said it is not immediately clear what qualifying facilities receive, but it's likely there will later be soft or hard incentives tied to this designation.
Related: huawei chip capacity and expansion, overseas compute dependence, local governments and industry