I wrote that Chinese banks are turning from real estate to data centers.
I noted that data-center projects face approval trouble because of their high power requirements.
I shared the assessment that large projects “have a chance of approval within China’s eight designated national computing hub regions, but little prospect outside them”.
I shared the Caixin link in my reply: https://t.co/ruNJ9Q8LMa.
I also track the systems around data-center power: China’s grid expansion, the infrastructure built alongside individual campuses, and the limits and safeguards that shape where data centers can grow.
I noted that China is building grid infrastructure alongside power plants, including ultra-high voltage lines, battery storage, and pumped storage.
I reported that China announced in May that it would invest $700 billion in grid infrastructure through 2030.
I called the report I shared a “Great report.”
I shared an Ohio resident’s support for data centers: “I'm all about data centers. I think we need them.”
The Ohio resident I quoted recognized competition with China while arguing that data centers need safeguards: “I know we're in competition with China and all that crap, but I also think we need safeguards.”
The Ohio resident said, “I don't want the damn data center to take over.”
I said Envision built an 800V solid-state transformer for a massive data center in China.
I reported that Chinese banks are turning from real estate to data centers.
I noted that data-center projects face approval trouble because of their high power requirements.
I shared the assessment that large data-center projects have a chance of approval within China’s eight designated national computing hub regions, but little prospect outside them.
I follow the scale and power needs of data-center growth in China, including projected electricity demand and the time it can take to connect new facilities to power.
I noted that Chinese companies pledged projects in Ulanqab, Inner Mongolia, with a combined estimated capacity of 12.5 gigawatts.
I called @ZeyiYang’s Wired article a “Great piece.”
By 2030, China’s data-center electricity demand is expected to grow by 4x.
The China forecast reaches 774 TWh by 2030.
The China forecast is 6% of total power consumption.
By comparison, US data-center power demand is projected to reach 649 TWh by 2030.
The US projection makes up 12% of US power demand by 2030.
I shared a source link for the China forecast: https://t.co/KqHLQnXpxE.
I shared a source link for the US forecast: https://t.co/vbSfOaWaHk.
For a 100,000-card cluster in China, construction from groundbreaking to operation typically takes 8 to 12 months.
Supporting power infrastructure for these data centers often takes 18 to 24 months.
A representative of a local state-owned computing platform described the timing mismatch this way: “The data center waits for the electricity,”
I noted that in China there is a lag between when a data center is built and when it’s connected to power.
I described Johor as “a pivotal hub for the global AI data center buildout.”
I said Johor has received $42 billion in investment after neighboring Singapore paused new data center projects.
I shared the claim that All the U.S. & Chinese hyperscalers are there.
I said those U.S. and Chinese hyperscalers have Nvidia Blackwell chips.
I called the FT piece a Great piece.
I noted that 15 GW capacity was planned for Ulanqab alone.
I identified the FT installment as Part I of III.
I found the data on Chinese data centers at home and abroad very interesting.