I hired a contractor to do work before I move into my new place.

I described the contractor’s job as having lots of moving pieces.

The contractor initially said he’d be done before December first.

When the contractor called with an update, he repeated that it would be done before December 1st. I joked, “This must be some sort of record!”

I think about building a strip mall from the ground up, but rising construction costs and weaker returns have changed how I view that long-held dream.

I think about it all the time.

I think major conversions no longer make economic sense.

I always dreamed of building a strip mall from the ground up, but I believe it won’t happen.

I believe the return on the time, effort and risk is no longer justified because of the new cost of construction and end of the 4 cap days.

I said, “Dealing with construction is the worst thing about real estate and it’s not even close.”

My posts about a painter describe a separate real-estate experience: a quoted price, an amount already paid, a claimed balance, and a planned final walk-through.

A painter quoted me $18,200 months ago.

I paid the painter $6,000.

After finishing the work, the painter said I owe him $11,500.

I planned to fill him in when he got there for the final walk thru.

I said the painter did a great job.

In my reply to my earlier post, I wrote: “Painter quoted me $18,200 months ago. Paid him $6,000, he’s now done with the work, and says I owe him $11,500.”

In that reply, I wrote: “Will fill him in when he gets here today for the final walk thru. Did a great job, too.”

---